Any kind of machine in the early stages of use, have to go through the process of running in, different machines in the run-in period need to pay attention to different issues, here is to introduce the vertical roller mill in the run-in phase need to pay attention to what are the problems.
Ultrafine grinding installation, after going through the test phase, put into the production process, does not mean that you can smoothly carry out the production, but also to experience the run-in period, such as our new car, but also to run through the trial period, to be more Good use, ultra-fine mill, it is in the run-in stage, the internal parts will be worn, this time is prone to failure, the need for a lot of attention to production anomalies, if you find abnormal The situation, the need for timely shutdown for processing, here is to introduce what needs attention in the run-in period of the problem.
Many mistakes: Because of the structure of the vertical roller mill, performance is not enough (especially the new operator), easy to malfunction due to failure, or even cause mechanical accidents, so put into production before the need for staff Reasonable training to make it a more comprehensive understanding of the structure of the machine so that problems can be found anytime, at any time to solve, the other to strengthen the lubrication, do not overload the work, promptly check whether the parts are loose, and tighten the parts, and to be correct Operating machinery and equipment to avoid causing unpleasant consequences.
The article introduces the vertical roller mill in the run-in period need to pay attention to the problem, mainly through the above four aspects of the analysis, we in the actual production process, the run-in phase must pay more attention to these aspects, to reduce this stage Ken The impact that can emerge on production and life expectancy, so that the machine better into the production process.