Not signed in (Sign In)

Categories

Vanilla 1.1.5a is a product of Lussumo. More Information: Documentation, Community Support.

  1.  

    Correct operation is one of the important Efficient Quarry Crusher Manufacturers factors to ensure the continuous normal operation of the jaw crusher. Improper operation or carelessness during operation is often the main cause of equipment and personal accidents. The correct operation is strictly in accordance with the provisions of the operating regulations.


    1. Preparations before starting. Before the jaw crusher is started, the equipment must be thoroughly inspected. Check the wear condition of the crushing tooth plate, adjust the size of the ore outlet; check whether there is ore in the crushing chamber, if there is a large piece of ore, it must be taken out; check whether the connection bolt is loose, the protection cover of the pulley and the flywheel is intact, triangle Whether the elasticity of the belt and tie rod spring is appropriate, the filling level of the oil storage tank (or dry oil reservoir) and the condition of the lubrication system, whether the electrical equipment and signal system are normal, etc.


    2. Precautions during operation. (1) Before starting the crusher, the oil pump motor and cooling system should be started first. After 3-4 minutes, when the oil pressure and oil flow indicator are normal, start the motor of the crusher; after the start, if the crusher issues The abnormal sound should be stopped and the machine should be restarted after the defects have been identified and eliminated. The crusher must be started without load. After a period of time, the machine can be operated normally after a period of time. The ore fed to the crusher should be gradually increased until it is fully loaded.